In 2027, New York City buildings in Community Districts 11, 12, 14, 15 and 17 must file their Local Law 152 gas piping certification by December 31, 2027. Steam-heated buildings with three or more apartments must send the first Local Law 151 radiator notices between January 1 and 16, 2027, and covered boilers need their annual inspection between January 1 and December 31, 2027.
- Local Law 152 gas piping inspection: due December 31, 2027 for Community Districts 11, 12, 14, 15 and 17, in every borough.
- In Brooklyn that covers Bensonhurst, Bath Beach, Gravesend, Borough Park, Kensington, Midwood, Flatbush, Sheepshead Bay, Manhattan Beach, Gerritsen Beach, Homecrest and East Flatbush.
- Missed the 2026 deadline (Districts 4, 6, 8, 9 and 16)? You still have to inspect and file.
- Local Law 151: Annual Notice to tenants January 1 to 16, 2027; tenants reply by February 15; Tenant No Response Form to HPD by March 1.
- Annual boiler inspections: January 1 to December 31, 2027, with 180 days to correct defects.

Every December our phones fill up with owners who just learned their building was due. The 2027 list is a big one for southern Brooklyn: five community districts, including several neighborhoods a few minutes from our shop on 8th Avenue. This guide puts every 2027 plumbing, gas and heating deadline for New York City building owners in one place, with the official sources at the bottom.
Local Law 152: who is due in 2027
Local Law 152 of 2016 requires a periodic inspection of the exposed gas piping in most New York City buildings. The city runs it on a four-year cycle and assigns the year by community district. According to the NYC Department of Buildings schedule, buildings in Community Districts 11, 12, 14, 15 and 17, in all five boroughs, must file their certification by December 31, 2027. Those same districts come due again in 2031.
In Brooklyn, the city's community board list puts these neighborhoods in the 2027 districts:
- District 11: Bensonhurst, Bath Beach, Gravesend and Mapleton.
- District 12: Borough Park, Kensington, Ocean Parkway and Midwood.
- District 14: Flatbush, Midwood, Kensington and Ocean Parkway.
- District 15: Sheepshead Bay, Manhattan Beach, Gerritsen Beach, Homecrest, Kings Bay, Madison and East Gravesend.
- District 17: East Flatbush, Remsen Village, Farragut, Rugby and Erasmus.
Neighborhood names do not follow district lines exactly, and some neighborhoods are split between two districts. The community district on your building's DOB record is what sets the year.
What the 2027 inspection involves
- A licensed master plumber, or a qualified individual working under one, inspects the exposed gas piping in common areas and non-residential spaces. Gas piping and appliances inside individual apartments are not part of it.
- One- and two-family homes are exempt. Three-family homes, walk-ups, co-ops, condos and mixed-use buildings are not. Our guide on which buildings are exempt from Local Law 152 covers the details.
- The owner gets the inspection report, and the certification is filed in DOB NOW: Safety within 60 days of the inspection.
- Unsafe conditions are fixed right away. Other defects must be corrected and certified within 120 days, or up to 180 days when more time is needed.
- The inspection can happen any time in 2027. Owners who book in the spring avoid the December rush and leave time for corrections.
See our Local Law 152 inspection page for how we handle the inspection, the corrections and the filing.
Missed the 2026 deadline?
Buildings in Community Districts 4, 6, 8, 9 and 16 were due by December 31, 2026. In Brooklyn that includes Bushwick, Park Slope, Carroll Gardens, Red Hook, Crown Heights and Brownsville. If your building did not file, the requirement does not go away: you still have to inspect and certify, and the DOB can issue a civil penalty for the missed filing. If your building failed its inspection, our page on what happens after a failed Local Law 152 inspection explains the next steps.
Local Law 151: the first steam radiator notices
Local Law 151 of 2025, also called Ben Z's Law, covers steam radiator safety in buildings with three or more apartments heated by steam. The NYC Department of Housing Preservation and Development began enforcing it on May 9, 2026, and the first full notice cycle runs in early 2027:
- January 1 to 16, 2027: deliver the Annual Notice for Inspection of Steam Radiators to every tenant, in English and Spanish.
- February 15: tenants return the completed notice.
- March 1: the Tenant No Response Form is due to HPD for apartments that did not reply.
- Every two years: steam radiators must be inspected in apartments where a child under six lives, and in the common areas.
Our Local Law 151 page explains which buildings are covered and how the inspections and HPD records work.
Annual boiler inspections in 2027
The NYC Department of Buildings requires a yearly inspection of low-pressure boilers in residential buildings with six or more apartments, SRO buildings, and mixed-use and commercial buildings. The 2027 cycle runs from January 1 to December 31, 2027. The report is filed in DOB NOW: Safety. If the inspector finds defects, the owner has 180 days from the inspection date to correct them and file an affirmation of correction. The DOB charges late fees for late reports and can issue a $1,000 penalty per boiler when a report or an affirmation of correction is never filed.
Boilers in buildings with five or fewer apartments are exempt from the DOB inspection, but they still need a yearly cleaning and safety check. See our annual boiler inspection page.
2027 calendar for NYC building owners
| Date | What is due | Who it applies to |
|---|---|---|
| January 1 | 2027 boiler inspection cycle opens | Buildings with boilers covered by the DOB annual inspection |
| January 1 to 16 | Local Law 151 Annual Notice to tenants | Steam-heated buildings with 3 or more apartments |
| February 15 | Tenants return the Local Law 151 notice | Same buildings |
| March 1 | Local Law 151 Tenant No Response Form to HPD | Same buildings |
| May 31 | NYC heat season ends | Residential buildings |
| October 1 | NYC heat season begins | Residential buildings |
| December 31 | Local Law 152 certification deadline | Community Districts 11, 12, 14, 15 and 17 |
| December 31 | 2027 boiler inspection cycle closes | Buildings with covered boilers |
Plan one visit for several rules
Many Brooklyn buildings fall under more than one of these laws: a 1920s walk-up with a steam boiler can need a Local Law 152 gas inspection, a Local Law 151 radiator inspection and an annual boiler inspection in the same year. Booking them together means one access arrangement with tenants, one set of findings and one plumber responsible for the corrections and the filings.
Nationwide Plumbers has worked in Brooklyn's older buildings from our shop at 6923 8th Avenue since 1984, under NYC Licensed Master Plumber #2023. We inspect, file and correct in all five boroughs. To get on the 2027 schedule early, call 718-748-2727.
2027 deadlines FAQ
Which NYC buildings have a Local Law 152 gas inspection due in 2027?
Buildings in Community Districts 11, 12, 14, 15 and 17, in every borough, must file their periodic gas piping certification with the NYC Department of Buildings by December 31, 2027. One- and two-family homes are exempt. The inspection can be done any time during 2027.
Which Brooklyn neighborhoods are due for Local Law 152 in 2027?
In Brooklyn, the 2027 districts include Bensonhurst, Bath Beach and Gravesend (District 11), Borough Park, Kensington and Midwood (District 12), Flatbush and Midwood (District 14), Sheepshead Bay, Manhattan Beach, Gerritsen Beach and Homecrest (District 15), and East Flatbush (District 17). Check your building's DOB record to confirm its district.
What happens if my building missed the December 31, 2026 Local Law 152 deadline?
The requirement does not go away. Buildings in Community Districts 4, 6, 8, 9 and 16 that did not file still have to be inspected and certified, and the DOB can issue a civil penalty for the missed filing. Schedule the inspection as soon as possible.
When do Local Law 151 steam radiator notices go out in 2027?
Owners of steam-heated buildings with three or more apartments must deliver the Annual Notice for Inspection of Steam Radiators to every tenant between January 1 and January 16, 2027. Tenants return it by February 15, and the Tenant No Response Form is due to HPD by March 1.
When is the 2027 NYC boiler inspection deadline?
The annual boiler inspection cycle runs from January 1 to December 31, 2027. If the inspector finds defects, the owner has 180 days from the inspection date to correct them and file an affirmation of correction in DOB NOW: Safety.
Official sources
- NYC Department of Buildings, Periodic Gas Piping System Inspections
- NYC Department of Buildings, LL152 of 2016 FAQs
- NYC Department of Buildings, Low-Pressure Boiler Requirements
- NYC HPD, Steam Radiator Inspections
- NYC Community Affairs Unit, Brooklyn Community Boards
Call Nationwide Plumbers at 718-748-2727, we answer 24/7.

